Done! South bedroom benchwork

The bulk of the benchwork in the south bedroom is finished. The benchwork runs along 3 of the 4 walls. My treadmill (which I use daily) is up against the 4th wall. Next on the job list is dealing with the 4 windows in the 2 bedrooms. Stay tuned.

North wall with single track shelf behind the door
North wall
Northwest corner with tunnel to the north bedroom
West wall
Southwest corner
South wall
Looking towards the east
Northwest corner tunnel
Overview of the south bedroom. My inversion table will be folded up and removed during operating sessions.

Dealing with the windows is the next issue.

8 thoughts on “Done! South bedroom benchwork

Add yours

    1. Hey Tom. The track plan is moving along slowly. I’ve subscribed to jomrd.com (The Journal of Model Railroad Design). Bob Chant has a ton of designs he’s drawn for clients posted. I’ve been playing with CadRail and have actually pulled out of storage my tote of Peco turnouts salvaged from the CWI. I’ve been laying them out on the benchwork to physically see what’s gonna fit.

      Like

Leave a reply to Paul Jz Cancel reply

Website Built by WordPress.com.

Up ↑