After another detour to install our new induction range and the wiring for it where the propane range was, I’ve progressed on the trackage in Illinois (the south bedroom). The last of the feeders were wired in and the track tested. Everything ran well with no dead sections. I then filled in all the missing ties that were removed to make soldering the feeders easier.
Illinois has….
- 12 industries with 38 spots
- 1 interchange yard with 16 spots
- 34 turnouts
- 135 feet of track
- 76 track feeders
Next up, painting the track.





Leave a comment