Today’s progress

I received the next box of valance shelf brackets from Amazon today. In the north bedroom. I installed the brackets on the walls. The means of valance installation across the windows still hasn’t been decided upon.

North Wall. The cardboard test valance is clamped to the brackets.

East Wall. The closet will house a large industry of some kind.

South Wall. This is the common wall with Bedroom 2. There will be an opening in the wall below the right hand most bracket.

West Wall. The benchwork isn’t leveled yet or attached to the wall.

Leave a comment

Website Built by WordPress.com.

Up ↑